Critical barriers to safe and secure drinking water may include sources (e.g. groundwater contamination), treatments (e.g. treatment plants not properly operating) and/or contamination within the distribution system (infrastructure not properly maintained). The performance assessment of these systems, based on monitoring, process parameter control and experimental tests, is a viable tool for the process optimization and water quality control. The aim of this study was to define a procedure for evaluating the performance of full-scale drinking water treatment plants (DWTPs) and for defining optimal solutions for plant upgrading in order to optimize operation. The protocol is composed of four main phases (routine and intensive monitoring programmes - Phases 1 and 2; experimental studies - Phase 3; plant upgrade and optimization - Phase 4). The protocol suggested in this study was tested in a full-scale DWTP placed in the North of Italy (Mortara, Pavia). The results outline some critical aspects of the plant operation and permit the identification of feasible solutions for the DWTP upgrading in order to optimize water treatment operation.

Methodological approach for the optimization of drinking water treatment plants' operation: a case study

SORLINI, SABRINA;COLLIVIGNARELLI, MARIA CRISTINA;CASTAGNOLA, FEDERICO;
2015-01-01

Abstract

Critical barriers to safe and secure drinking water may include sources (e.g. groundwater contamination), treatments (e.g. treatment plants not properly operating) and/or contamination within the distribution system (infrastructure not properly maintained). The performance assessment of these systems, based on monitoring, process parameter control and experimental tests, is a viable tool for the process optimization and water quality control. The aim of this study was to define a procedure for evaluating the performance of full-scale drinking water treatment plants (DWTPs) and for defining optimal solutions for plant upgrading in order to optimize operation. The protocol is composed of four main phases (routine and intensive monitoring programmes - Phases 1 and 2; experimental studies - Phase 3; plant upgrade and optimization - Phase 4). The protocol suggested in this study was tested in a full-scale DWTP placed in the North of Italy (Mortara, Pavia). The results outline some critical aspects of the plant operation and permit the identification of feasible solutions for the DWTP upgrading in order to optimize water treatment operation.
2015
Environmental Engineering/Energy covers resources concerned with the effects of humans on the environment, and the development of controls to minimize environmental degradation. This category also covers the development, production, use, application, conversion, and management of nonrenewable and renewable energy sources.
Esperti anonimi
Inglese
Internazionale
ELETTRONICO
71
4
597
604
8
drinking water treatment plant, monitoring programme, performance assessment, upgrading, water quality.
no
5
info:eu-repo/semantics/article
262
Sorlini, Sabrina; Collivignarelli, MARIA CRISTINA; Castagnola, Federico; Crotti, Barbara Marianna; Raboni, Massimo
1 Contributo su Rivista::1.1 Articolo in rivista
none
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11571/1099258
Citazioni
  • ???jsp.display-item.citation.pmc??? 1
  • Scopus 25
  • ???jsp.display-item.citation.isi??? 21
social impact