The traditional optimization approach for water distribution mains is that of considering a single design scenario with prefixed nodal demands representing the peak values at the end of the life cycle of the construction. Instead, this paper presents a different approach for the design of water distribution mains aimed at considering the phasing of construction. It makes it possible to identify, on prefixed time steps or intervals (for instance 25years), the upgrade of the construction rendering the network able to satisfy, during the expected life of the system, growing nodal demands related to the increment in the population served. To show the benefits of this approach in comparison to using a single design flow, an optimization methodology, aimed at introducing new pipes in the network as needed at each time step, was set up and applied to a simple case study, where two different scenarios were considered concerning the growth of the network. Results showed that this approach is able to yield better results when compared with the single flow design, because it enables short-term construction upgrades to be performed while keeping a vision of the expected long term network growth.

Accounting for phasing of construction within the design of water distribution networks

CREACO, ENRICO FORTUNATO;FRANCHINI, MARCO;
2014-01-01

Abstract

The traditional optimization approach for water distribution mains is that of considering a single design scenario with prefixed nodal demands representing the peak values at the end of the life cycle of the construction. Instead, this paper presents a different approach for the design of water distribution mains aimed at considering the phasing of construction. It makes it possible to identify, on prefixed time steps or intervals (for instance 25years), the upgrade of the construction rendering the network able to satisfy, during the expected life of the system, growing nodal demands related to the increment in the population served. To show the benefits of this approach in comparison to using a single design flow, an optimization methodology, aimed at introducing new pipes in the network as needed at each time step, was set up and applied to a simple case study, where two different scenarios were considered concerning the growth of the network. Results showed that this approach is able to yield better results when compared with the single flow design, because it enables short-term construction upgrades to be performed while keeping a vision of the expected long term network growth.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11571/1106398
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 49
  • ???jsp.display-item.citation.isi??? 50
social impact